Project management

Die Macherei


ProjectConstruction of a mixed-use quarter
Project locationMünchen
Services SMVQuality assurance and scheduling of planning
ClientArt-Invest Real Estate Gmbh & Co. KG + ACCUMULATA Real Estate GmbH
ArchitectsOSA-Ochs Schmidhuber Architekten GmbH / MSM – Meyer Schmitz-Morkramer Main GmbH / HWKN – Hollwich Kushner Architecture DPC (NY, USA)
Construction costsconfidential
Realisation period2017 - 2021
Contact person SMVJeanette Baranowsky
Project description

In the Berg am Laim district of Munich, a mixed-use quarter is being built on the approximately 26,500 m² site. Offices, gastronomy, retail, trade and a hotel will be built on an area of around 67,000 m² on top of a two-storey underground car park.


The six individual buildings – spread over four construction sites – were designed by different architects to provide a wide range of different layout and design options. This is also reflected in the different heights and shapes of the individual buildings. The free design possibilities of the open-plan office spaces should attract established companies as well as start-ups from all over the world.

h